Page 38 - 210922_BACnet_Europe-Journal_35_low
P. 38

Solutions  Anwendungen

          Early Expert Approval as a Strategic


          Advantage in Smart Building Projects


          Frühzeitige Sachverständigenabnahme

          als strategischer Vorteil in Smart Building


          Projekten




          Fire protection is extremely important
          in construction technology for large-
          scale projects in Germany, especially
          when it comes to the implementation
          of smart, system-complex buildings. In
          addition to safety requirements, factors
          such as cost control and precise time
          and commissioning management play a
          decisive role.
          Brandschutz hat in der Bautechnik auf
          deutschen Großprojekten und insbeson-
          dere bei der Realisierung smarter, system-
          komplexer Gebäude einen extrem hohen
          Stellenwert. Neben sicherheitstechnischen
          Anforderungen spielen dabei Faktoren wie
          Kostenkontrolle und ein präzises Zeit- und
          Inbetriebnahmemanagement eine entschei-
          dende Rolle.


          Against this background, the question arises: How
          can fire protection-related systems be reliably
          tested and approved in the early stages of a   Visualization EDGE Friedrichspark Visualisierung EDGE Friedrichspark © Bloomimages/EDGE Technologies
          project?

          Open system architecture for transparent   Proven use in demanding smart building   infrastructures. In conjunction with  BACnet,
          fire protection                   projects                           this  creates  a  consistent,  scalable  integration
                                                                               environment that supports both efficiency and
          One solution is offered by the rigentoBSK   The practicality of this approach is demonstrated  sustainability  goals.  System openness,  easy
          fire damper control system from HOSCH   in several projects by real estate developer  integration, and high operational reliability form
          Gebäudeautomation in combination with the   EDGE Technologies. Following successful  the technological cornerstones of this proven trio.
          established  BACnet communication standard.   deployments in Berlin's East Side Tower and
          This combination makes it possible to have   Hamburg's ElbSide, rigentoBSK is currently  Fire protection as a building block of
          essential fire protection technology functions   being implemented in EDGE Friedrichspark, an  sustainable building quality
          expertly tested independently of higher-level   office complex in Berlin-Friedrichshain designed
          peripheral systems such as building management   for CO -neutral operation. HOSCH is convinced  Integrated fire protection solutions thus
                                                 2
          systems (BMS) or network infrastructure.  that, especially in smart building projects, the  contribute not only to safety, but also to the
                                            possibility of early expert acceptance makes a  economic efficiency and sustainability of
          The effectiveness of rigento is therefore not only   significant contribution to minimizing risk and  modern buildings. This is becoming increasingly
          evident in the event of a fire. A particular advantage   ensuring a structured project process.  relevant, particularly in the context of demanding
          is the reliable visualization of system statuses right               sustainability standards such as DGNB
          from the start of operation. This is supported by   HOSCH also relies on Schneider Electric's  certification, which specialists in smart & green
          the standardized  BACnet/IP interface, which   EcoStruxure Building solution for this system  buildings such as EDGE Technologies are striving
          ensures transparent processing and provision of   concept. The IoT-enabled, open-system platform  for in German projects.  
          all relevant information – from damper positions   is based on standardized communication protocols
          to alarm messages.                and is specially designed for complex building





          38  BACnet Europe Journal 44 03/26
   33   34   35   36   37   38   39   40   41   42   43